← Back to V10Safe

Position Calculation Breakdown

TONUSDT (LONG)

Position OK - Within tolerance

1 Account Equity

Master Equity

$50373.20

PKS

Slave Equity

$17944.27

V10Safe

Equity Override Active

Using override value: $25000.00 instead of actual equity

Effective Slave Equity for Calculation

$25000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $25000.00 / $50373.20 = 0.496296

Multiplier Applied

Effective Ratio = 0.496296 × 2.0 = 0.992591

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 179.50000000 × 0.992591 = 178.17013809

Master Position

179.50000000

Expected Slave Position

178.17013809

4 Actual vs Expected

Expected

178.17013809

Actual

201.20000000

Deviation

12.93%

Quantity Deviation

+23.02986191

Notional Deviation (USD)

+$46.33

Mark Price: $2.01

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

178.17013809 = 179.50000000 × ($25000.00 / $50373.20) × 2.0