← Back to V10Safe

Position Calculation Breakdown

LABUSDT (LONG)

MAJOR MISMATCH - Wrong Size

1 Account Equity

Master Equity

$50434.28

PKS

Slave Equity

$17944.27

V10Safe

Equity Override Active

Using override value: $25000.00 instead of actual equity

Effective Slave Equity for Calculation

$25000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $25000.00 / $50434.28 = 0.495695

Multiplier Applied

Effective Ratio = 0.495695 × 2.0 = 0.991389

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 930.00000000 × 0.991389 = 921.99194675

Master Position

930.00000000

Expected Slave Position

921.99194675

4 Actual vs Expected

Expected

921.99194675

Actual

1043.00000000

Deviation

13.12%

Quantity Deviation

+121.00805325

Notional Deviation (USD)

+$547.83

Mark Price: $4.53

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

921.99194675 = 930.00000000 × ($25000.00 / $50434.28) × 2.0