← Back to HybridStepped

Position Calculation Breakdown

TAOUSDT (SHORT)

Position OK - Within tolerance

1 Account Equity

Master Equity

$50434.28

PKS

Slave Equity

$19799.25

HybridStepped

Equity Override Active

Using override value: $25000.00 instead of actual equity

Effective Slave Equity for Calculation

$25000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $25000.00 / $50434.28 = 0.495695

Multiplier Applied

Effective Ratio = 0.495695 × 2.0 = 0.991389

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 0.39300000 × 0.991389 = 0.38961595

Master Position

0.39300000

Expected Slave Position

0.38961595

4 Actual vs Expected

Expected

0.38961595

Actual

0.45200000

Deviation

16.01%

Quantity Deviation

+0.06238405

Notional Deviation (USD)

+$17.44

Mark Price: $279.53

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

0.38961595 = 0.39300000 × ($25000.00 / $50434.28) × 2.0