← Back to HybridStepped

Position Calculation Breakdown

SOLUSDT (SHORT)

MAJOR MISMATCH - Wrong Size

1 Account Equity

Master Equity

$50434.28

PKS

Slave Equity

$19799.25

HybridStepped

Equity Override Active

Using override value: $25000.00 instead of actual equity

Effective Slave Equity for Calculation

$25000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $25000.00 / $50434.28 = 0.495695

Multiplier Applied

Effective Ratio = 0.495695 × 2.0 = 0.991389

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 13.28000000 × 0.991389 = 13.16564844

Master Position

13.28000000

Expected Slave Position

13.16564844

4 Actual vs Expected

Expected

13.16564844

Actual

15.31000000

Deviation

16.29%

Quantity Deviation

+2.14435156

Notional Deviation (USD)

+$183.77

Mark Price: $85.70

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

13.16564844 = 13.28000000 × ($25000.00 / $50434.28) × 2.0