← Back to HybridStepped

Position Calculation Breakdown

ASTERUSDT (SHORT)

MAJOR MISMATCH - Wrong Size

1 Account Equity

Master Equity

$50434.28

PKS

Slave Equity

$19799.25

HybridStepped

Equity Override Active

Using override value: $25000.00 instead of actual equity

Effective Slave Equity for Calculation

$25000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $25000.00 / $50434.28 = 0.495695

Multiplier Applied

Effective Ratio = 0.495695 × 2.0 = 0.991389

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 3574.00000000 × 0.991389 = 3543.22496524

Master Position

3574.00000000

Expected Slave Position

3543.22496524

4 Actual vs Expected

Expected

3543.22496524

Actual

4243.00000000

Deviation

19.75%

Quantity Deviation

+699.77503476

Notional Deviation (USD)

+$487.06

Mark Price: $0.70

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

3543.22496524 = 3574.00000000 × ($25000.00 / $50434.28) × 2.0